
Feeding Bottles Module
This specific module includes the automatic feeding bottles system prepared to:
For plastic bottles only.
Bulk charge of bottles.
Bottle size up to Ø70 mm and 180 mm height.
Bottle volume from 10 ml to 250 ml.
Production capacity:
40 u/min (2.400 u/h).
Or 60 u/min (3.600 u/h).
Module’s general characteristics as per Base Clean Room Module:
Clean room level (see details here):
Dimensions:
External: 5,84 m x 2’35 m x 2’6 m (Length x Width x Height).
Internal: 5,72 m x 2’23 m x 2’5 m (Length x Width x Height).
Classified ISO 8 as per ISO 14644 (Class D GMP).
Clean room panels and finishing as per SAMPU standards.
Technical level (see details here):
Technical area installed above including HVAC ducts, cables and piping.
Total combined height of clean room level + technical level is 4,5 m.
Design and Manufacturing criteria
Operable by one person.
Bottles output height 950 ± 50 mm. Adjustable if required.
Vertical positioning of bottles.
All adjustable elements are reachable for the operator from only one equipment's side and adjustable with a numeric value.
Poka-Yoke and fail-safe philosophies.
According to regulations:
European Commission Vol. 4 EU Guidelines to Good Manufacturing Practice. Medicinal Products for Human and Veterinary Use.
Good Manufacturing Practices of the Food and Drug Administration (FDA).
21 CFR Part 11 “Electronic Records, Electronic Signatures”. Food and Drug Administration Title 21 of the Code of Federal Regulations.
Equipment Directive 2006/42/EC.
EN ISO 14122: Safety of machinery - Permanent means of access to machinery, part 1 till 4.
EN ISO 13849: Safety of machinery - Safety-related parts of control systems.
HMI
Information retained with data integrity complying with CFR 21 Part 11.
Prepared to generate:
Batch report.
Alarms report.
Audit trail report.
Remote connection for aftersales services.
Documentation
Design documentation.
DQ protocol + report.
As-built documentation:
CE Declaration of Conformity.
Layouts.
Electrical diagram.
Pneumatic diagram.
Datasheet of valves and/or instrumentation and components.
Calibration Certificates.
Operation manual:
Start-up procedure.
Format changeover procedure.
Cleaning procedure.
Alarms list with every troubleshooting.
Maintenance manual.
Spare parts list and fungible assets.
FAT & SAT protocols + report.
IQ & OQ protocols + report.
PQ protocol + report.
The standard language of all documentation will be English.






